Nuclide
roadmapsRoadmap

Isotope supply roadmap: reactor dependence → non-uranium production → accelerator-made actinium

The radioactive ingredients that make theranostics work come from a small number of ageing nuclear reactors, generators and accelerators around the world. A shortage anywhere in that chain delays cancer scans and treatments; new non-uranium and accelerator-based production lines are being built to fix that, but they take years and hundreds of millions of dollars.

Story

top
1960s-2008historicstep 1 of 7

Reactor-dependent, HEU-based supply

Global molybdenum-99 supply concentrates in a small number of ageing, mostly HEU-fuelled research reactors (Canada's NRU, the Netherlands' HFR, Belgium's BR2, France's OSIRIS, South Africa's SAFARI-1), each serving large multi-country markets with no domestic US production.

2009-2010historicstep 2 of 7

The global Mo-99 shortage

NRU (Chalk River) and HFR both go offline for unplanned repairs at overlapping times, causing a worldwide shortage of molybdenum-99/technetium-99m that disrupts nuclear medicine imaging and prompts a US and international policy response to diversify supply.

2012-2018historicstep 3 of 7

Non-HEU domestic Mo-99 production

The American Medical Isotope Production Act (2012) directs the US Department of Energy/NNSA to fund non-HEU Mo-99 production. NorthStar Medical Radioisotopes' RadioGenix System, using neutron-capture production of Mo-99 at the University of Missouri Research Reactor, receives FDA approval on 8 February 2018, the first domestic, non-uranium Mo-99 production since the 1980s.

2018-2024currentstep 4 of 7

Lutetium-177 demand outpaces capacity

Approvals of Lutathera (2018) and Pluvicto (2022) sharply increase demand for reactor-produced lutetium-177, straining both irradiation capacity and the enriched ytterbium-176 supply used for no-carrier-added Lu-177 production; multiple national reactor operators (ANSTO, IRE, NTP Radioisotopes) expand production lines.

2024-2026currentstep 5 of 7

Accelerator-made actinium-225 reaches commercial scale

TerraPower Isotopes announces commercial-scale, weekly actinium-225 production from October 2024, using a natural decay method from thorium-229 recovered from US Department of Energy uranium-233 stockpiles in partnership with Isotek. In March 2026 the company announces a second, much larger facility in Philadelphia.

2026-2029emergingstep 6 of 7

Building twentyfold actinium-225 capacity

TerraPower Isotopes breaks ground on its $450m Bellwether Laboratory in Philadelphia in May 2026, intended to increase global actinium-225 production capacity twentyfold alongside expansion at its Everett, Washington site; the Pennsylvania state government contributes grant funding. Production is expected to begin in 2029.

2029+speculativestep 7 of 7

Speculative: a resilient, diversified isotope supply

Proposals under discussion include Western enrichment of ytterbium-176 to add a second Lu-177 supplier, a coordinated international reserve and shared schedule for medical isotope reactors, regional radiopharmacy hubs with harmonised transport rules for short-lived isotopes, and a global isotope supply observatory that forecasts shortages before they happen.